Showing posts with label Revit. Show all posts
Showing posts with label Revit. Show all posts

Thursday, November 8, 2012

November Meeting

Attendees: Dave Bleiman, Nora Klebow, Nancy McClure, Guy Messick, Mabe Ng, Bruce Madsen, Raimi Tan, Karen Thomas, Dan Tsui, Marla Ushijima, Glen Walson, Les Young.

Bruce hosted us at HOK this month (thanks, Bruce!). He had a great presentation on "BOB - BIM Outside the Box" and has graciously shared slides from his powerpoint presentation with us. You can download it here.

Bruce was delayed in starting his presentation due to enthusiastic discussion as people were arriving.

Bruce and Glen compared notes on the current state of Revit MEP. HOK now mandates that MEP work be performed in Revit. Interface Engineering has about 120 projects on Revit MEP. They agree that implementation has been difficult, though improving. The software is now adequate for the task, but workflow remains a major issue.

Data remains an ongoing challenge in BIM. Nancy notes that over the life of a project/building, it's difficult to maintain the integrity of the data. While designers don't want to be data-driven, Nancy points out that heavily-programmed buildings can benefit greatly by using data in a BIM design workflow. Nora notes that hospitals are in the forefront of this strategy because while the diagnostic and testing (D+T) components are different every time in terms of various metrics and adjacencies, patient rooms remain similar from project to project. Dave and Glen agree that hospitals benefit the most from evidence-based design because the owners are deeply involved in the design process, which is critical for its success.

Bruce began his presentation by identifying various aspects of implementing BIM and comparing the cost implications of each. While  BIM software is not inexpensive, that direct cost is a small fraction of the overall costs, as shown in his pie chart above. Marla and Karen questioned the slice for coordination since coordination has always been the architect's responsibility, but Bruce and Dave agree that the effort for BIM coordination is significantly greater than what's traditionally been done by architects because it's handled in the earlier phases of the project rather than getting pushed off to the contractor.

The largest single cost of BIM is for the content. The elements of this are building the firm-specific content for templates, building the firm library, acquiring content as needed, and managing all that content. Bruce's presentation focused on acquisition of content: building, finding, and/or buying it.

Built content can be started from a template, or by modifying existing content. Intuition would assume that using existing content would be easier, but as Glen pointed out, between time spent searching, modifying, and reverse-engineering to fix defects, it's often faster and easier to build from scratch.

Free content can be found from a variety of sources:
  • BIM box: In addition to the default content provided, Autodesk offers 30 additional regional libraries.
  • Within the firm: project archives, firm library, local office library
  • Community exchanges: Balda Architect, Beck Group, CADforum, Revit City, Revit Database, Revit Forum, TurboSquid, Woodwork Institute
  • Commericial consolidators: ATS, Autodesk SEEK, ARCAT, ARCxl, Bimobject, BIM STOP, Bimstore, CADdetails, Design content, National BIM Library, POLANTIS, PRODUCTSPEC, SteelSelect, Sweets Network, Reed Construction, RevitFAMILIESonline, SMARTBIM
  • Manufacturers: Bruce has identified over 1100 manufacturers providing BIM content, with more coming on board every day. He feels that manufacturers are supporting BIM much better/faster than they had CAD.
Dave told us that manufacturers must pay to be listed with Autodesk SEEK, which limits the value of that resource. He also feels that using the National BIM Library is a route to guaranteed failure. Everyone agreed that while there's a lot of free content out there, there's a lot of time and effort required to find and adapt it—which is not free.

Buying content can be done from stores (Archvision, BD GROUP, Designconnected, ENGworks, FORMFONTS, Little Details Count, Revit Content, Revit Furniture, revitstore, RevitBay, revitcars, Symbol Machine, TurboSquid, Yellowbryk) or commissioned to be custom-built (andekan, LONDON INFOTECH, Pinnacle Infotech, REVIT FACTORY, Revit MEP Store, SumexDesign, Revit Content, TheModus).

Level of detail within a family is critical—it has to have enough information to be worthwhile, but too much detail blows up the size of the model and slows down the work. Bruce promoted three levels of detail within a family: simple cubes with schedules can serve for preliminary design; 2D symbols are usually sufficient for orthographic views; while more detailed 3D geometry can be reserved for where it's really necessary. Dan also suggests swapping out objects as necessary when rendering.

Bruce proposed that it's up to us to address the difficulties we face with content. Currently our efforts are redundant—all firms are addressing these topics independently. Instead we must ask for what we want, provide feedback, and contribute to an industry-wide solution. As a starting point, he solicited input from us on our greatest frustrations related to BIM content. Among those things most mentioned were time lost due to searching for content, content that's not appropriate for a model's needs, poorly-built content, and interruption to work flow.

Bruce identified the things we want:
  • A massive library: all the content we need, including system objects, generic objects, and manufacturer-specific objects.
  • Consistency: file names, type names, parameters, and parameter names. These standards should be established and maintained by industry groups, professional organizations, national and international standards groups, some kind of AECO Wiki, and all of us in the industry.
  • High quality: adherence to standards and quality control, making sure all parameters flex properly.
  • Findable: A searchable database or some other resource is necessary to make accessing the content from so many sources feasible. Search parameters need to include discipline, Revit category and library folder names, object name, author, LOD, standard followed, generic vs. specific, and a rating of the quality.
  • Accessible: cloud-based, mobile, download-able, and insert-able
  • Free or low-cost: all stakeholders should sponsor improvement: manufacturers to fund specific content; consolidators to fund generic content; stores to develop generic and non-component content; professional and trade organizations to develop standards for names and units; and content users to develop standards  for display and function, and to provide input and feedback. Large AEC firms could also be drawn upon to build content.
On the subject of standards, Dave noted that there are existing systems that can be drawn upon. ISO9000, the National CAD Standards, and Omniclass have already sorted some of these things out.

Thursday, October 11, 2012

October Meeting

Attendees: Dave Bleiman, Mario Guttman, Bruce Madsen, Marla Ushijima

The group was really stoked after the presentation last month from Doug Childs on Lean Design, so we continued the topic in our informal discussion this month.

We all agreed that Lean faces resistance from the design community, which generally views it as a manufacturing-focused methodology. Marla proposes that the specialized terminology of Lean can be off-putting to those adverse to Lean Design, but that the specific words aren't critical to following Lean principles. Those principles are in line with generally-accepted best business practices—listen to what the client wants, don't waste time on activities that don't advance those goals, and learn from past experience—so if project managers jettison the terminology they can still advance Lean principles and tools on a project basis. Mario feels that the ritual derived from more overt implementation is important for organizational implementation.

We discussed dangers of ritual as well, and the difference between theoretical and actual benefits. We likened it to LEED certification, which can sometimes lead to an emphasis on getting points rather than effective sustainability. Dave questioned the appropriateness of the new Google headquarters' LEED Platinum rating, Mario questioned the slavish reliance on photometrics and Ecotect analysis vs. innovative approaches to getting effective lighting. Dave pointed out the irony of daylighting when shades are positioned to prevent glare but left in that position indefinitely by occupants who then turn on the lights.

How does Lean benefit an organization? Design professions are all about getting the work, doing the work, and getting paid for the work. Lean is mostly about doing the work. Its value in getting the work—marketing—is debatable. Bruce questions whether clients care whether or not you're using Lean; Mario questions whether a firm should try to sell Lean to a client or just let attitudes and performance speak for itself. He suggests that using Lean Design shows a serious commitment to QA, which could be of value in marketing. Added client value and potential marketing opportunities could be a selling point for management buy-in, which Bruce feels is critical for follow-through on whole-office implementation. Dave says that competitive advantage speaks volumes, and compares it to the implementation of BIM. As a demonstration, Mario suggested choosing the most disliked process in the office—such as doing dishes or processing reimbursables—and use a Lean process to improve it.

If internal opposition to Lean is expected, Marla suggests stealth implementation by a committed project manager on an individual project—to start small and demonstrate the value of Lean processes. Bruce and Dave agree that any change represents risk to an organization, so a pilot project must be used for evaluation before spreading it to the broader organization.

Dave is hopeful that Lean would reduce the need  for staff to stay late for a crush at deadline time, through more effective project planning. As an aside, Mario praised sheet lists as remaining of value in the BIM process to identify, plan, and track the work effort. We all agreed that knowing when to NOT do something is the right thing to do—such as when there's insufficient information to proceed effectively. Dave points out that the creative instinct sometimes fights against such efficiency.

Marla asked Dave about PopIcon for Architecture, which is apparently in its beta 3 version. Dave says they're facing a conundrum because they've made the library folder structure rigid to prevent mistakes, but the lack of flexibility creates a problem for architects. Dave is concerned that if they provide more flexibility, PopIcon would become a scapegoat for the resulting user errors. He asked for additional feedback from the beta users.

Mario brought up library management issues with BIM. Perkins+Will has a well-defined nomenclature for family file names, but the folder structure is more difficult to police. Mario thinks it's important for family creators to take ownership of their families and is promoting a structure in which folder names indicate the author, software version, and the unit type (imperial vs. metric). Bruce commented that the person at HOK who was responsible for creating their library of custom content was laid off as an expendable overhead cost. The result is a well-crafted collection of families being overtaken by content created ad-hoc by various designers. Bruce is concerned that the legacy standards—which are really good—will degrade over time.

We discussed the idea of using Omniclass vs. folder structure to classify families and tie them into e-spec. Mario notes that currently specs are typically based on prototypes; Omniclass tends to be either too obvious or too obscure and the middle ground is too small for value. Marla suggested polling our Linked In group to see who's using e-specs.

Bruce asked whether Lean is anathema to design? Architects are typically not interested in "process." Marla points out that certain tasks in the design professions are amenable to process improvement, others not so much. Bruce mentioned "optioneering," a methodology to systematically explore a large number of design options using parametric design tools. Mario pointed out that staffing realities can mess with a balanced work flow. Bruce wonders if Lean can shorten the timeline of a project; Mario wonders whether it can improve accuracy.

Bruce asked us how many manufacturers we think are providing Revit-specific content. Mario guessed twenty are making good content, plus about 500 others. Bruce said there are over a thousand.

Mario says he's developed a batch processor for in-house use at Perkins+Will to create 3D and plan previews, drawn from defined views within the BIM file. Marla asked whether parameters are included in the preview information; Mario doesn't see that as a high priority, and thinks a notes field would be of more value. He wonders whether he could mine the parameters in a family to populate a notes field.

There are several industry events coming up: Arcadia and Greenbuild will both be held in San Francisco, as will AIA|CC's Now • Next • Future conference. Autodesk will be in Las Vegas; both HOK and P+W will be sending speakers only.

Dave proposes a future meeting focusing on the Lean A3 document; he thinks it's really valuable. Marla would like to further examine the ties between Lean, BIM, and IPD. Bruce has a great interest in all the things required for successful BIM use that aren't part of the software package. He believes those things are a hundred times as expensive as the software itself. He has offered to host next month's meeting at HOK on the subject of BOB—BIM Outside the Box.